New blog Post

Sample test

Hydraulic Re-mining

In order to recover residual metals deposited onto tailings dams, use is made of high-pressure monitoring of the dry dam material by means of high-pressure monitoring with monitor guns. more…

Civil Works

Cyclone Engineering Projects not only operates and reclaims tailings dams but also assists with any initial or extra works that are or will be required around the operations to assist with the works that must be conducted. more…

Tailing Dams

When considering the design of a tailings storage facility there are many parameters which impact on the optimum site selected and the storage and tailings discharge methods used. more…

Solution Trench

Solution trenches are an integral part of the TSF infrastructure as this will transport water to the RWD. more…

Siphon Decant System

The Siphon decant system is an alternate decanting system to the penstock or barge operation on the tailings dams. more…

Return Water Dams

Return water dams are the storage facilities for process water which is sent to the plant or reclamation sites. more…

Piezometer installation

Piezometer stand pipe gives indications of the phreatic levels inside the tailings storage facilities and this is used for dam safety reports. more…

Penstock Tower Sleeving

Majority of tailings storage facilities have penstock decant systems which are raised with concrete rings which are packed more…

Penstock Decant System

The penstock decant system is operational on majority of the tailings dams and are used to remove process water from the facility more…

Back to Top